Next you will need to remove the old chalking from the baseboard that was used when the base was originally installed.
Install laminate floor under baseboard.
1 starting at one end of the wall slide the flat end of a pry bar between the.
Pull the nails out from the back of the base board.
Use a few strips of.
Without removing the existing baseboard is this possible.
Then line up the overlapping end use the floor installation tool to pull the last piece into place and tap the overlapping end until it is tight.
The process is easier if you use longer pieces rather than shorter ones.
Use your finish nailer to attach the base molding at the marked wall stud locations.
Pry them into position with a laminate flooring pull bar.
Slide a scrap piece of laminate under the baseboard heater to see if the laminate will fit under it whole.
You can use nail pullers or even a pair of pliers.
Otherwise you can install the laminate under the heater cutting the pieces according to the wall.
Then slide the long edge of the flooring under the other baseboard straightening the flooring piece into place.
If using an adhesive you can disregard stud locations and simply apply the glue as needed.
Everyone i ve talked to says t.
If you don t have enough clearance you will need to notch the pieces around the baseboard heater.
There will be chalking on the top and most likely some on the back that will need to be removed.
Wall base molding laminate flooring accessories at bestlaminate step 2.