When installing bamboo flooring it is essential to check that your subfloor is dry level and flat.
Installing nail down bamboo flooring.
Remove the batten board.
How to level a subfloor prior to installing wood or bamboo flooring youtube.
Step 2 allow bamboo flooring to acclimate new bamboo boards you take from your flooring packages will need to adjust to temperature and position changes for about 3 days before you install them.
Expansion gaps of 3 4 are required between flooring and all walls in room.
Some squeaking and crackling of the floor is normal when using the nail or staple down method and is not considered a defect.
Nail down a batten board.
Bamboo flooring installation is similar as hardwood flooring installation.
Furthermore you need to leave an expansion gap of at least 10mm around the perimeter of the room and in doorways.
Direction of the flooring should be installed at a 90 degree right angle to the floor joists.
The nail down system of installing hardwood flooring is usually done by a professional onto any subfloor surface other than concrete.
Inspect the quality before installation open cartons of bamboo flooring or wood flooring to check the flooring if all is right no quality problems like splitting insect holes finishing problem and milling problem.
Glue down installation the glue down method is commonly used when installing over concrete that is either on at or above grade.
Make sure the floor is level.
Glue down is the most popular installation.
However if you are planning to install your bamboo flooring over joists then you will need to secret nail the planks into place.
Vary the length of the first board.
Insert the last row.
Determine a starting wall.
The floor grade should vary by no more than 3 16 per 10 foot radius.
Bamboo flooring can be installed by glue down nail down or floating.
Tighten down any loose floorboards or sub flooring and use leveling compound to fill seams in your floorboards.