Available for use at both ground floor and in certain circumstances at first floor prestressed beam and block flooring offers a flexible and dependable method to overcome difficult site conditions.
Installing beam and block floor.
Only a trained slinger will attach and detach beams from the lifting device.
This should be done by brushing the grout over the floor with a stiff broom after the surface has been well wetted so that the grout penetrates into the joints and provides a monolithic construction.
Place floor beams at the centres shown on the drawing positioning infill blocks between the extreme ends of the beams as work progresses in order to ensure the correct spacing.
Varying the concrete beam centres during construction offers a quick and economical solution for a wide range of problems both at ground and upper floor levels.
First dwarf small walls are built to support a large number of cast concrete beams.
So like mike said i was thinking of running cables from below and up so use the battons of the ceiling.
In part 3 of skill builder s series following an extension build it s time for the suspended beam and block flooring generally speaking there are two option.
The stressline range of prestressed beam and block and suspended flooring provides the ideal solution where land has been made up is sloping or has potential contamination concerns.
A 1 4 cement sand slurry mix grout should be well brushed into the floor.
Beam and block flooring demonstrates good noise reduction and fire resisting properties and is also suitable to host underfloor heating systems.
At this stage drainage and service pipes are also fitted into the floor voids.
Benefits of concrete beam block floor systems.
Beam and block flooring is renowned for being fast cheap and simple to install requiring no special constructions skills and is the cheapest way to build a highly durable and solid floor.
The whole floor area must be grouted with a 3 1 sand cement mix using coarse sand as soon as possible after the fixing of the beams and blocks has been completed.
Prior to grouting the floor should be thoroughly cleaned and wetted to ensure effective seal.
They will have to lay insulation down on top of floors so don t really want to lay cables along as they will only get damaged.
Next the concrete beams are carefully arranged across the full floor area of the house.
Installing ground floors a minimum void of 150 mm must be provided between the soffit of the floor and the solum and a continuous damp proof course must be laid beneath the beam ends.
The installation of a beam and block floor is not usually weather dependent and therefore specifying this form of construction can reduce site delays that other methods might encounter.
If available a propriety lifting device will be used if not a certified sling s will be used this sling is to be checked frequently by trained staff.
The new build is block and beam floors to ground floor 1st floor and 2nd floor.
Today things are different and most are built in the beam and block style.