But it works either way.
Install cabinets on top of tile flooring.
The second option is to lay the floor first and install the base cabinets on top of the finished.
Your flooring is higher than normal.
Measure to make sure the room has sufficient clearance for the new tile floor.
The benefit of installing the tile assembly after the cabinets stone countertops and other dead loads are installed understanding that the floor was designed to handle these loads is to help ensure the system is placed into compression before the tile is installed meaning the force of downward pressure on the finished installation is minimized.
My question here is.
Finally install the cabinets on both strips and attach the toekicks.
If you install a new layer you may have to change baseboards raise cabinets above refrigerators or cut higher grooves into door mouldings.
This piece should be at least 2 inches wide and about inch thicker than the total thickness of the flooring including any vapor barrier or cushion.
It is always recommended to install cabinets before floating flooring rather than installing cabinets on top of floating floors.
Screw a strip of the same thickness to the floor next to the wall.
The other consideration is that if the flooring is thick like hardwood or ceramic tile it locks the base cabinets in place and they can be very hard to remove if for some reason one needs repair or replacement.
Should i tile the entire floor before the new cabinets are installed so the cabinets will be on top of the new tile or let them install the cabinets then i lay down the new tile on the remaining exposed plywood.
Then install cabinets then the tiles can go down.
Install flooring first when to avoid uneven flooring install floor panels or plywood risers underneath to level it out.
Now install the new flooring but keep it about a inch from the first filler strip.
Just make sure the durock or tile backer is down first.
If you are going to put in a hardwood floor and it is a total of 1 1 2 and you want 4 toe kick then the kick should be 5 1 2 tall and the cabinets should be 37 1 2 tall from the concrete.
Typically cabinets come before flooring in most cases given standard flooring heights you will install the cabinets before the floor covering.
Floor covering or finish flooring is the surface that you see and walk on not the subfloor under the underlayment or underlayment between subfloor and finished layer.
This lowers the risk of peaking in the future.
Accommodate for the flooring thickness in your toekicks.
Installing over glue down floors is not a concern.
There are some that want the tiles down first which is okay but if the floor is out then you end up with gaps and most of the time the builder gc does not plan to put shoe mold around.
Some flooring is an inch or two higher than average.
On top of the new plywood i plan to do ceramic tiling.
Installation of cabinets and appliances may depend on the original height of the floor.